Construction (Design and Management) Regulations 2015 (CDM 2015)

The Works described within this quotation are subject to the Construction (Design and Management) Regulations 2015 (“CDM 2015”). The Client and all other dutyholders are required to fulfil their respective statutory duties.

Where the project involves, or it is reasonably foreseeable that it will involve, more than one contractor, the Client is required to appoint in writing a Principal Designer and Principal Contractor with the appropriate skills, knowledge, experience and organisational capability to fulfil their respective duties.

Unless specifically stated otherwise within this quotation, where ReSpace Ltd is appointed to manage and control the construction works and its subcontractors, this quotation assumes that ReSpace Ltd will act as Principal Contractor under CDM 2015. Where ReSpace Ltd is to act as Principal Contractor, the Client shall confirm the appointment in writing before the construction phase begins.

The Client shall provide all relevant Pre-Construction Information available to it as soon as practicable and sufficiently in advance of commencement to allow the Works to be properly planned. This shall include, where relevant, information relating to the existing building and structure, asbestos and hazardous materials, existing services, access and occupation restrictions, fire and emergency arrangements and any existing Health & Safety File.

Where appointed as Principal Contractor, ReSpace Ltd will plan, manage and monitor the construction phase and coordinate matters relating to health and safety during the construction phase in accordance with CDM 2015. ReSpace Ltd will prepare, develop and implement an appropriate Construction Phase Plan, coordinate contractors under its control, provide suitable site-specific inductions and ensure appropriate construction-phase welfare and site management arrangements are in place. Where existing Client welfare facilities are proposed for use, their availability and suitability will be agreed before commencement.

Where ReSpace Ltd is appointed as a Contractor only, the Client shall provide details of the appointed Principal Designer and Principal Contractor before commencement. ReSpace Ltd will cooperate with the Client, Principal Designer and Principal Contractor as required and provide appropriate RAMS and relevant health and safety information relating to its Works.

The Client remains responsible for fulfilling its duties under CDM 2015, including making suitable arrangements for managing the project, allocating sufficient time and resources, providing relevant Pre-Construction Information and ensuring required dutyholder appointments are made.

Where the project is notifiable under CDM 2015, the Client shall ensure that the project is notified to the Health and Safety Executive and that the F10 notification is displayed and provided as required.

Nothing within this quotation relieves any party of any statutory duty or responsibility imposed upon it under CDM 2015 or other applicable health and safety legislation.

HSE guidance: Construction (Design and Management) Regulations 2015.

ReSpace - London

20 Little Britain
London
EC1A 7DH

ReSpace - Tunbridge Wells

The Pantiles Chambers
85 High Street
Tunbridge Wells
Kent, TN1 1XP

0333 533 3535
info@respace.co.uk